Elevator Acceptance Test: Complete Commissioning Checklist and EN 81-20 Verification Tests

Glossary › Acceptance Test

A formal series of tests carried out on a newly installed or modernised elevator to verify that it meets all applicable safety standards before commissioning for public use.

Full Definition
The acceptance test (commissioning test or first periodic inspection) is performed by a notified body or competent inspection authority before the elevator is handed over to the building owner. It verifies compliance with the applicable edition of EN 81-20 or equivalent national standard through a structured test programme covering: rated load test, overspeed governor trip test, safety gear test, buffer test, traction check, levelling accuracy, door force and kinetic energy measurement, safety circuit verification, and emergency lighting. All test results are documented and a Declaration of Conformity is issued upon successful completion. Failed tests require corrective action and re-test.
Back to Glossary
Term
Acceptance Test
Usage Area
All newly installed elevators modernised elevators requiring new DoC and after major component changes
Explore All Terms
300+ technical definitions for the elevator industry
View All Terms